复合顶板条件下充填法开采数值模拟研究

来源 :煤炭技术 | 被引量 : 0次 | 上传用户:zhao3785
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
为研究充填法开采对复合顶板受力及变形规律的影响,运用三维模拟软件3DEC进行数值计算,建立了数值计算模型,采用4种不同的充填方案,从顶板岩层应力分布和顶板岩层位移分布两方面分析了不同充填条件下复合顶板的受力及变形规律。研究表明充填开采后采空区的应力较大,充填体承担了工作面前方煤体的较大部分支承压力,有效控制地表沉陷,进而减轻对煤巷的破坏。 In order to study the influence of filling method on the stress and deformation of composite roof, 3DEC numerical simulation software 3DEC was used to calculate the numerical calculation model. The numerical calculation model was established. Four different filling schemes were used to calculate the stress and deformation of roof. In this paper, the stress and deformation of composite roof under different filling conditions are analyzed. The research shows that the stress of gob area after filling and mining is relatively large. The filling body takes up most of the supporting pressure of the coal body in front of the working face, effectively controls the surface subsidence and thus reduces the damage to the coal lane.
其他文献
目的:探讨不同术式治疗髌骨骨折的疗效.方法:分别采用AO钢丝张力带、可调试聚髌器、钢丝环扎、粗丝线环扎治疗髌骨骨折167例,其中131例获得随访.结果:术后随访4个月-48个月,A
目的:探讨CPM预防股骨髁上、髁间骨折后膝关节僵硬的疗效.方法:自1995年~2007年,本院共收治各类股骨髁上、髁间骨折病人53例,其中结合CPM治疗30例.随访0.5年-3年,平均1.3年.结
目的:总结360例骨质疏松性colles 骨折患者的治疗与康复状况.方法:对178例I或Ⅱ型骨折者采用手法复位,石膏托外固定;对182例Ⅲ或Ⅳ型骨折手法复位不良者,采用切开复位解剖钢