论文部分内容阅读
秦山二期核电工程是我国自主设计、自主建造、自主管理、自主运营的首座2×600MW商用压水堆核电站,是国家“九五”期间唯一采用“以我为主、中外合作”方式建设的国产化核电项目。该核电站成功地吸收、借鉴了国内外核电设计、建造的先进经验,采用了当今世界上技术成熟、安全可靠的压水堆型,按照国际标准设计建造。它的成功有力地推动了我国核电建设国产化、标准化、系列化的进程,为今后自主设计、建造百万千瓦级核电站奠定了基础。创造了国内核电工程建设中又一个奇迹。本刊编辑部荣幸地约请到秦山二期核电工程的总指挥———核电秦山联营有限公司董事长赵宏先生,特就读者感兴趣的问题采访了赵董事长。采访内容如下。
Qinshan Phase II nuclear power project is the first 2 × 600MW commercial pressurized water reactor nuclear power station independently designed, independently constructed, operated and operated independently in China. It is the only one constructed by means of “I-based and Sino-foreign cooperation” during the “Ninth Five-year Plan” period Domestic nuclear power projects. The nuclear power station has successfully absorbed and used the advanced experience of nuclear power design and construction at home and abroad for reference. It has adopted the mature and safe pressurized water reactor type in the world and designed and built in accordance with international standards. Its success has effectively promoted the localization, standardization and serialization of China’s nuclear power construction and laid the foundation for the future design and construction of a million-kilowatt-class nuclear power station. Creating another miracle in the construction of nuclear power projects in China. Our editorial department honored to invite Qinshan Phase II nuclear power project commander --- Nuclear Power Qinshan Associates Co., Ltd. Chairman Zhao Hong, special readers interested in the interview with Chairman Zhao. The interview is as follows.