1电站概况小山水电站是松江河梯级工程首级电站,位于吉林省抚松县境内。电站主要任务是调峰、调相和事故备用。水库总库容1.07亿m3,调节库容0.53亿m3,为年调节水库。发电厂房为引水式地面厂房,装有两台混流式机组。单机容量80MW,年利用小时数为20...
1 Power Station Overview Xiaoshan Hydropower Station is the Songjiang River cascade project of the first power station, located in Fusong County, Jilin Province. The main tasks of the power plant are peak regulation, phase modulation and accident backup. The total reservoir capacity of 107 million m3, adjusting the reservoir capacity of 0.53 billion m3, for the year to adjust the reservoir. Power plant for the diversion ground plant, equipped with two Francis units. Stand-alone capacity of 80MW, annual utilization hours of 20 ...