科基特兰坝提高大坝抗震能力的措施

来源 :水利水电快报 | 被引量 : 0次 | 上传用户:xxyy001a
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
加拿大魁北克水电局 (BC)已开始在科基特兰坝实施一个临时性的提高大坝抗震能力的计划 ,该计划将于 2 0 0 1年 4月完成。该措施就是确保大坝能满足目前的地震荷载标准。尽管这座已运行了 90a的老水力冲填坝的条件没有发生变化 ,但采用现代勘测技术已证实 ,在坝内存在松碎带 The Quebec Hydroelectric Power Bureau (BC) in Canada has started to implement a temporary plan to increase the seismic capacity of the dam in Coquitlam, which will be completed in April 2001. The measure is to ensure that the dam can meet the current seismic load standards. Although conditions have not changed for this old hydraulic cavern dam that has been in operation for 90 years, the use of modern surveying techniques has confirmed the presence of loose belts in the dam
其他文献
1996年全年来华旅游入境人数突破5000万人次,达5112.75万人次,比上年增长10.22%,完成年计划107.6%;国际旅游(外汇)收入突破百亿美元大关,达到102.00亿美元,增长16.81,完成年计
Sun Yat-Sen, father of the 1911 Revolution that toppled the Qing Dynasty and ushered in the first republic in China’s history, died in 1925. He wanted to have
The Drum Tower in Hangzhou has witnessed vicissitudes of history for hundreds of years. It was first erected in 591 AD. It went through many expansion projects
By means of a test flume with semi-circular cross-section, bedload and suspended-sediment transport of non-cohesive material have been studied in transient flow
当前,小区建设越来越多,而居民的消费也出现理想化与理性化,对于人们而言,住宅绿化的重要性越来越大,物业部门对小区的绿化管理也加大了重视程度。在小区中,通过绿化措施,能
绿色岛国新西兰以其蓝天白云、金沙银滩、青山碧水、如盖绿荫称誉世界。可是你也许想不到,新西兰曾因为森林的消失造成土地沙化、土质恶劣,并对农牧业生产造成严重影响。是什
1 工程概述引额济克工程位于新疆维吾尔自治区境内,是以引额尔齐斯河的水供克拉玛依市、乌鲁木齐市及沿线各地区的工农业城市生活用水的一项跨世纪的大型调水工程。设计年引
在国外旅行中的两件事果果行李在美境内乘机旅行,我从不耽心随身带的行李过重。每当我感到自己难以将沉重的行李高举过头顶塞进行李箱时,便很自然地左顾右盼,这时,准有一位先生带
虽然柬埔寨全面实现和平仍然有待时白,但今天的柬埔寨政可正致力于战后重建,积极吸引外商投资,全面发展旅游业,首都金边的景象已焕然一新。1866年任位的柬埔寨皇帝诺罗敦一世从故
伊朗最近曾进行研究以评价高 115m的混凝土面板堆石坝的动态响应。该分析建立在动力平面应变有限差分研究的基础之上 ,考虑了输入的各种地震能级。该分析是按满库和空库进行