秦皇岛港煤码头一期工程翻车机房地下构筑物为一圆形钢筋混凝士沉井,沉井内径24米,预制高度11.2米(-2.1~-13.2米)。总高13.575米。沉井刃脚标高-13.3米(其中
The underground structure of the dumper engine room of Qinhuangdao Port Coal Terminal Phase I project is a circular reinforced concrete sunk well with an inner diameter of 24 meters and a precast height of 11.2 meters (-2.1 ~ -13.2 meters). The total height of 13.575 meters. Sunken edge blade elevation -13.3 meters (of which