岭澳核电站电气整套启动试验

来源 :电力建设 | 被引量 : 0次 | 上传用户:v80ak48
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
针对岭澳核电站 10 0 0MW机组电气系统组成的特点 ,从分析各单项调试程序的内容与接口关系入手 ,并吸取大亚湾核电站电气整套启动试验的经验和教训 ,制定了一套完整的电气整套启动试验方案。试验首次由中方人员担任总指挥及各单系统试验负责人 ,成功地完成了岭澳核电站 2台发电机组的电气整套启动试验 ,创造了巨大的经济和社会效益 Aiming at the characteristics of the electrical system of 100 000MW generating units in Ling Ao Nuclear Power Station, starting with the analysis of the contents and interfaces of the individual commissioning procedures, and drawing on the experience and lessons from the complete set of start-up tests for the electrical facilities in Daya Bay Nuclear Power Station, a complete electrical start-up test Program. For the first time, the Chinese personnel served as commander in chief and heads of individual system tests successfully completing the complete electrical start-up test of two generator sets at Ling Ao Nuclear Power Station and creating tremendous economic and social benefits
其他文献
学位
发电机出口断开装置,分为仅能开断负荷电流的负荷开关、具有有限开断容量的断路器和具有全开断容量的断路器3种.装设发电机出口断开装置,可以提高机组的可用率,简化厂用电的
美国学者索尔蒂斯曾言:“我们如何思考知识,确实在相当程度上影响着我们如何思考教育。”①人对知识的性质、价值、类型、结构及传播途径等方面的认识,即知识观,影响着人们对教
本文通过对荣华二采区10
期刊