某船厂在建造修船码头时,因受各方面条件的限制,码头后方的部分驳岸,不能放坡开挖建造挡士墙或有锚板桩墙,经研究后决定试用钻孔灌注桩的施工方法建造桩排式地下墙码头驳岸。我们本着边试验边投产的精神,投入了这项试验工程。现将用这种施工方法建造码头驳岸的情况扼要介绍如下。 (一) 设计 某船厂修船码头后方的桩排式地下墙驳
When a shipyard is building a pier for ship repairing, due to the restriction of various conditions and the partial revetment at the back of the pier, it is not allowed to excavate and construct the retaining wall or the anchor sheet pile wall by slope excavation. After the study, it is decided to try out the construction of the bored pile Methods Construction of piled underground piers dock. We put this pilot project in line with the spirit of testing and commissioning. The construction of pier revetments by this method of construction will now be briefly described as follows. (A) Designing the pile wall underground barge behind the shipyard pier