1991年9月19日至28日,水利水电规划设计总院会同四川省建委、省计经委,在成都对我院提出的《南桠河冶勒水电站初步设计报告》进行了审议,审查通过了该报告。冶勒水电站位于大渡河支流南桠河上,是一座具有多年调节性能“龙头”水库的水电站。水库总库容2.98亿m~3,调节库容2.76亿m~3。电站设计水头580m,最大引用流量44.4m~3/s,装机容量240MW,保证出力105.6MW,年均发电量5.88亿kW·h,全部为优质有效电能,并可担负系统调峰、调频和事故备用任务。冶勒水库建成后,可使南桠河下游五个梯级水电站增加保
From September 19 to September 29, 1991, the General Planning and Design Institute of Water Conservancy and Hydropower, in conjunction with the Sichuan Provincial Construction Commission and the Provincial Planning and Economic Commission, examined the preliminary design report of the Nanluhe River Yele Hydropower Station proposed by our hospital in Chengdu and reviewed and approved The report. Yele hydropower station is located in the Dadu River tributary Nanhe River, is a multi-year performance adjustment “leading” reservoir hydropower station. The total reservoir capacity of 298 million m ~ 3, adjust the storage capacity of 276 million m ~ 3. Power station design head 580m, the maximum reference flow of 44.4m ~ 3 / s, installed capacity of 240MW, to ensure that the output of 105.6MW, the average annual generating capacity of 588 million kW · h, all for the quality and effective power, and can assume the system peak regulation, frequency modulation and accident Alternate task. When the Yele Reservoir is completed, the five cascades at the lower reaches of the Nanxun River will be protected