怀洪新河天井湖引河闸工程,位于崇潼河以北,天井湖以南的苏皖省界处。该闸设计标准为3孔整体箱涵式水闸,闸孔每孔净宽6米,闸室顺水流方向长度为12米。 天井湖引河闸工程的施工,于1997年8月底基本完成。工程完工后不久,发现桥头堡与启闭机房的楼面分缝处,出现分缝宽度扩展现象,并呈发展趋势。同时发现,原本平直的上下游路边栏杆,出现两头高程下降的情况,远处望去,呈
Huai Hong River Patio Lake Diversion Project, located north of Chong Tong River, south of the Su-Wan Province Su-Wan border. The gate design standards for the overall 3-hole box-type sluice, gate hole net width of 6 meters per hole, sluice cis forward flow length of 12 meters. The construction of the courtyard lake lead river sluice project was basically completed by the end of August 1997. Shortly after the completion of the project, it was found that the gap between the bridgehead and the hoisting machine room had a widening phenomenon and showed a trend of development. Also found that the original straight railings on the lower reaches of the road, there are two levels of decline in the situation, looked away, was