论文部分内容阅读
本文建立了满足竖井平均月进度要求机械化配套后费用最省,平均月进度最高的数学模型。为解题方便,提出了按分系统分步求解的方法。
In this paper, a mathematic model is established to meet the requirements of the average monthly progress of vertical shaft, with the lowest cost and the highest average monthly progress after mechanized matching. In order to solve the problem conveniently, the method of solving by subsystems step by step is proposed.