论文部分内容阅读
改革开放以来,随着多座大中型水电工程的开工建设和投产,我国在水电建设的开发和发展方面前进了一大步,水电装机容量从1981年的2193万 kW 增加到1997年的6008万 kW,建成百万 kW 级的大型水电站和抽水蓄能电站10座,成功地解决了工程建设中的许多关键技术问题,工程实践促使我们在水电建筑安装施工和科技进步方面也相应地上了一个大台阶,在施工技术和工程规模的某些领域已处于国际先进水平,水电总公司系统各工程局、厂,近10年来在水电建筑市场中与同行
Since the reform and opening up, with the construction and operation of a number of large and medium hydropower projects, China has made significant strides in the development and development of hydropower construction. The hydropower installed capacity increased from 21.93 million kW in 1981 to 60.08 million in 1997 kW, built 10 million kilowatts of large-scale hydropower stations and pumped storage power station 10, successfully resolved many of the key construction technology problems, engineering practice prompted us to hydropower construction, installation and construction and technological progress has a correspondingly large Step, in some areas of construction technology and project size has been in the international advanced level, the hydropower head office systems Engineering Bureau, plant, nearly 10 years in the hydropower construction market with their peers