论文部分内容阅读
探讨国内首例应用台阶式虹吸出水系统中的运行、管理、设计问题,提出完善长江取水泵站设计的技术依据和措施。名词解释:常水位工况——陈行水库常水位5.50米长江常水位2.19米净扬程3.31米
Explores the operation, management and design problems of the first application of step type siphon effluent system in China, and puts forward the technical basis and measures for improving the design of the Yangtze River pumping station. Glossary: Normal water conditions - Chen Hang reservoir water level of 5.50 meters Yangtze River water level 2.19 meters net head 3.31 meters