论文部分内容阅读
1991年,在改革的大潮中,国内各路水电建设劲旅,如千帆竞发,百舸争流,从祖国的四面八方,涌入古都洛阳,扎营九曲黄河的最后一个峡谷——黄河小浪底水利枢纽建设工地。 黄河小浪底水利枢纽工程地处控制黄河水沙的关键部位。它的建成,可使黄河防洪标准从目前不足百年一遇提高到千年一遇,基本解除洪水对黄河下游的威胁。它是治理和开发黄河
In 1991, during the tide of reform, hydropower construction on various roads in China, such as the thousands of sail competitions and the competition of hundred talents, poured into the ancient capital of Luoyang from all directions of the motherland, camping on the Xiaolangdi Water Control Project of the Yellow River Construction site. The Yellow River Xiaolangdi hydro project is located in the key parts of the Yellow River water and sediment control. Its completion will enable the Yellow River flood control standards from the current less than once a century to a once in a thousand years, the basic release of floods on the lower reaches of the Yellow River threat. It is the governance and development of the Yellow River