煤矿长斜井TBM施工安全风险分析与评估

来源 :地下空间与工程学报 | 被引量 : 0次 | 上传用户:whynot2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
分析和辨识了煤矿长斜井TBM施工的风险因素,构建了二层级的风险评估指标体系。首先,对集对分析法中联系度的取值进行了改进;其次,采用熵权法对各个风险因素的权向量进行计算,构建了一种改进的集对分析法的煤矿长斜井TBM施工风险评估模型,研究了风险计算值与联系度的变化关系。最后,利用该模型对台格庙矿区煤矿长斜井(1#、2#实验井)TBM施工风险进行了预测与评估,给出了对风险偏好、不同的施工管理人员对风险的不同取值方法。研究表明该模型与方法在煤矿长斜井TBM施工风险分析中是有效的、实用的,而且也为煤矿长斜井TBM施工风险管控工作提供新的理论支持。 The risk factors of TBM construction in long inclined shafts of coal mines are analyzed and identified, and a two-level risk assessment index system is constructed. Firstly, the value of the connection degree in the set pair analysis method is improved. Secondly, the entropy weight method is used to calculate the weight vector of each risk factor, and an improved set-pair analysis method is proposed to construct TBM for the long shaft of coal mine Risk assessment model, the relationship between the calculated value and the contact degree of risk is studied. Finally, this model is used to predict and assess the risk of TBM construction in the long shaft (No. 1 and No. 2) coal mine pit in Taigmiao Mining Area. The risk preference and different values ​​of risk for construction managers are given method. The research shows that the model and method are effective and practical in risk analysis of long shaft inclined TBM construction in coal mine, and also provide new theoretical support for the risk management and control of long shaft inclined well in coal mine.
其他文献
患者,男,48岁.因头昏、乏力、面色苍白、全身密布皮下出血点、齿龈出血,于2004年3月25日入院.入院前曾在外院经骨髓检查诊断为再生障碍性贫血,用十一酸睾丸素、利血生、皂矾丸等治疗,但病情进行性加重而转入我院治疗。
据新华网报道,2012年春节期间,到海南三亚旅游的游客在当地消费时,三个菜价格高达4000元人民币。这引起了社会的强烈反响。而在2012年1月30日,海南三亚市政府新闻办的官方网站声称“2012年春节黄金周三亚没有接到一个投诉、举报电话,说明整个旅游市场秩序稳定、良好。”   点评:平心而论,按现有旅游市场监管能力和经营现状,似乎没有一个城市敢于发布这么完美的长假成绩单。之所以出现,首先是出于对维