论文部分内容阅读
随着大量工业项目进驻产业园区,厂房建设按照规范标准施工基本能满足生产要求,但对于一些特殊的厂房,须采取不同的施工技术措施。本文结合总装测试厂房工程,阐述了箱形基础底板大体积混凝土及78m高钢混组合柱的施工工艺,并探讨了室内活动平台的构造。
With a large number of industrial projects stationed in industrial parks, plant construction in accordance with the standard construction standards to meet the basic production requirements, but for some special plant, to take different construction techniques and measures. In this paper, combined with the assembly test plant project, expounded the box-shaped basement floor mass concrete and 78m high steel composite composite column construction process, and discusses the structure of indoor activities platform.