多沙河流上水库调洪计算

来源 :泥沙研究 | 被引量 : 0次 | 上传用户:officerkaka
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我国北方,特别是黄河流域,干旱少雨,降水量又集中干汛期七、八月份,由于水土流失严重,造成大量泥沙汇集河道,使水库迅速淤积,库容大幅度减小,兴利效益降低。 一九七○年陕西省水科所对全省120座库容100×10~4m~3以上水库进行调查,总库容7.28×10~8m~3,淤积3.43×10~8m~3,淤积库容占总库容的47.2%。山西省水利勘测设计 In northern China, especially in the Yellow River basin, arid and rainy days, with precipitated rainfall concentrated in dry seasons In July and August, due to serious soil erosion, large amounts of sediment were collected and rivers were drained, resulting in rapid siltation of reservoirs and a drastic reduction in storage capacity and a decrease in the profitability of development. In 1970, Shaanxi Provincial Institute of Water Resources investigated 120 reservoirs with a capacity of 100 × 10 ~ 4m ~ 3 in the province, with a total storage capacity of 7.28 × 10 ~ 8m ~ 3 and a siltation of 3.43 × 10 ~ 8m ~ 3. 47.2% of the total storage capacity. Shanxi Water Conservancy Survey and Design
其他文献
20世纪二、三十年代,中国的话剧进入了初步发展阶段,而京剧则进入了鼎盛期。由此一时期京剧和话剧对于古代乐府诗《孔雀东南飞》的改编可以见出,话剧和京剧并非是井水不犯河
一、前言我国近些年发生过几次较大的地震,震区内许多土坝都出现了不同程度的破坏,在海城、唐山地震中土石坝的震害率竟高达50~70%,目前关于土石坝抗震性能研究尚未 I. Pref
实施人才强国战略,造就高素质的劳动者,是职业技术教育者的根本任务。本文以对焊接加工教学中的课程体系改革、教材建设、教学方法、师资队伍建设等几方面的改革探索和实践发
1985年3月25—29日,在北京召开了国际水资源管理会议。根据会议前后搜集到的有关资料,以及在会议期间与法国同行的交谈,作者现就法国水资源管理作一简介。考虑到法国 March
本文探讨了随机最优化模型在水电站水库调度中的构造和应用,并特别分析论述了其存在的问题。建议了在水电站水库调度中应用模拟分析的方法,建立了具体的模拟模型,并提供了算
在中职教育阶段,计算机教学是一门实用性与实践性较强的学科,主要培养学生的计算机应用能力,包括知识掌握与操作技巧等,特别需要突出的是中职计算机教学的就业导向功能,以此
边界单元法是70年代末期发展起来的一种数值方法.应用于均质承压含水层非稳定流计算的边界单元法的公式推导,目前有二种途径,一为直接格林函数法.另一种为拉氏法.Liggett等
CM-A混凝土薄膜养护剂是石蜡乳状液类新型养护剂,水分损失量力0.039克/厘米~2[ASTMC156-74]。CM-A具有良好的保水性能,能够防止混凝土的干缩。养护混凝土试件的抗压、抗拉强
本文结合笔者经验,对目前中职学校学生特点及学生管理现状进行了分析,并针对现状提出了新时期中职学校学生管理的有效措施。通过对本课题的研究旨在帮助我们进一步认清当前中
到2015年初徐克执导的电影《智取威虎山》上映为止,作为一种文化文本(text)的《智取威虎山》,在历史上已有诸多不同艺术形态的呈现。较为著名、引起广泛社会反响的主要有:195