在确定鄱阳湖圩堤设计水位时几个有关问题的探讨

来源 :江西水利科技 | 被引量 : 0次 | 上传用户:rocxdp
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、前言由于鄱阳湖堤线长,防洪标准低,迫切需要加高加固以适应江湖洪水位提高的趋势。如何合理地确定设计水位是一个必需解决的问题。本文根据前人经验,从分析历史洪水资料入手,提出将圩堤设计水位的确定划分为湖盆区与五河尾闾平原圩区两部分。湖盆区主要指鄱阳湖周边,受长江洪水控制,以1980年长江中下游防洪座谈会确定的湖口防 I. Preface Due to the long embankment length of Poyang Lake and the low standard of flood control, there is an urgent need to increase and reinforce to meet the trend of increasing the flood level of rivers and lakes. How to reasonably determine the design water level is a problem that must be solved. Based on the experience of our predecessors, this paper starts with analyzing the historical flood data and proposes to divide the design of the levee dike into two parts: the lake basin and the polders in the Wuhewei plain. Lake basin mainly refers to the surrounding Poyang Lake, controlled by the Yangtze River flood to flood prevention in the middle and lower reaches of the Yangtze River in 1980 forum determined Hukou
其他文献
讨论了(左、右)理想继承性半群的一个充分必要条件及一些基本性质,进而给出了交换理想继承性半群的一个结构刻划,以及主因子或为0-单半群或为2元null半群的一个充分必要条件.
当前形式下,车辆通行数量极速增加,市政道路桥梁工程面临很大压力。施工进度与施工质量难免受到各种因素的影响,导致市政道路桥梁深受一些常见病害影响。本文主要总结了目前