The hydraulic characteristics of end-dump closure with the assistance of backwater-sill in diversion

来源 :Journal of Hydrodynamics | 被引量 : 0次 | 上传用户:zjlsxz
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The river closure is a key step in the water dam construction, and the end-dump closure is a general way to cut off the river flow. The hydraulic characteristics at the closure gap are the main factors which affect the extent of closure difficulty. A method is proposed to reduce the difficulty of diversion channel closure by pre-building a closure structure called the backwater-sill at the downstream toe of the closure gap to change the flow pattern at the closure gap. The results of the physical model test and the threedimensional numerical simulation indicate that the backwater-sill has the effects of raising the water level at the downstream toe of the closure gap, decreasing the water surface gradient, and reducing the closure drop and the flow velocity at the closure gap. The schemes with different dike widths, different closure gap widths, and different backwater-sill widths and heights are simulated. The results show that the height of the backwater-sill is the key factor affecting the hydro-indicators at the closure gap, while the influence of the dike width, the closure gap width or the backwater-sill width can be ignored. The higher the backwater-sill is, the lower the hydro-indicators will be. Based on the numerical simulations and the physical model tests on the hydraulic characteristics at the closure gap of the backwater-sill assisted closure, the hydro-indicators and its calculation method are proposed to provide a theoretical support for the river closure. The hydraulic closure at a key step in the water dam construction, and the end-dump closure is a general way to cut off the river flow. A hydraulic method at the closure gap are the main factors which affect the extent of closure difficulty. A method is proposed to reduce the difficulty of diversion channel closure by pre-building a closure structure called the backwater-sill at the downstream toe of the closure gap to change the flow pattern at the closure gap. The results of the physical model test and the threedimensional numerical simulation indicate that the backwater-sill has the effects of raising the water level at the downstream toe of the closure gap, decreasing the water surface gradient, and reducing the closure drop and the flow velocity at the closure gap. The schemes with different dike widths, different closure gap widths, and different backwater-sill widths and heights are simulated. The results show that the height of the backwater-sill is the key factor affect ing the hydro-indicators at the closure gap, while the influence of the dike width, the closure gap width or the backwater-sill width can be ignored. The higher the backwater-sill is, the lower the hydro-indicators will be. Based on the numerical simulations and the physical model tests on the hydraulic characteristics at the closure gap of the backwater-sill assisted closure, the hydro-indicators and its calculation method are proposed to provide a theoretical support for the river closure.
其他文献
一阵微风吹过詹妮弗的头发,金红色的太阳即将落山。海滩上的詹妮弗望着那火红的圆球,不禁惊异于它的颜色:中问是红彤彤的,向外柔柔地变成黄色。眼前的景象使她放松下来,出走
全球领先的特种化学品公司科莱恩近日出席了在北京举办的第12届中国企业社会责任国际论坛暨2016“金蜜蜂企业社会责任·中国榜”发布典礼,并荣获永续发展奖。“金蜜蜂企业社
近日,美国卡博特公司与合资伙伴内蒙古恒业成有机硅有限公司在内蒙古乌海合资建设的气相二氧化硅工厂破土动工。奠基仪式上,卡博特公司执行副总裁兼高性能化学品业务总裁Nick
盛禧奥近日宣布成功收购意大利API公司。API是位于意大利穆索伦泰的软聚合物解决方案领先制造商,拥有60年的悠久历史,并具有成熟的软聚合物生产工艺。收购后,该公司的管理人
为进一步拓展案件审理工作的惩教功能,使案件审理工作更好地融入惩防体系建设,必须积极开展处分决定说理性的实践探索,努力推动案件审理工作与惩防体系建设的有机统一。说理
群众连续举报,反映县政务中心食堂提前开午餐、干部提前就餐。对此,湖南省临澧县纪委、监察局于近日对县政务中心食堂行了一次暗访督查。督查发现,从上午11时23分开始,便陆续
近年来,安徽省明光市不断完善招投标采购监督管理体制,建立健全招投标采购工作机制,推行阳光招投标采购。自2010年以来,全市招投标交易资金年均节约率达14%。建立招投标采购
近年来,东风公司不断创新廉洁从业教育内容,着力构建反腐倡廉教育长效机制,开展一系列丰富多彩的教育活动,营造风清气正的氛围,为公司改革发展创造了良好的环境。建立廉洁文
智力因素,一般而言,属于先天因素,大部分学生的智力都差别不太大;非智力因素则侧重于后天的养成,非智力因素的高低是学生成绩优与差的重要因素之一。要想提高英语教学质量,教
今年以来,枣庄市峄城区人民法院在深入开展“为民、务实、清廉”为主题的群众路线教育实践活动中,切实转变工作作风,主动延伸审判服务职能,大力开展“一村一法官”活动,组织