论文部分内容阅读
补偿事件起因t英国土木工程师学会1995年11月出版的“工程施工合同”(简称ECC合同)将承包商可以向雇主索赔的事件称为“补偿事件”(Compensation Events)。ECC合同中的“核心条款”第60.1条列举了“补偿事件”的18种情况,可归纳为:雇主风险事件;雇主未履约的事件;项目
The cause of the compensation event The Engineering Contract (ECC Contract) published by the British Society of Civil Engineers in November 1995 referred to the Compensation Events as an event the contractor can claim from the employer. Article 60.1 of the “Core Terms” of the ECC contract lists 18 cases of “compensation incidents”, which can be summarized as follows: employer risk incidents; incidents of non-performance by employers; projects