论文部分内容阅读
SMW工法虽在许多围护中采用 ,但对此工法的总结 ,目前尚为数不多 ,本文结合地铁二号线静安寺车站下沉式广场这一工程实践 ,拟在 SMW桩的工程实践和机理上作初步的总结和分析 ,以期为工程技术人员在掌握桩体位移、支撑受力及其变化趋势时提供一些依据。
Though SMW method is adopted in many enclosure, the summary of this method is still few at present. Combined with the project practice of the subsidence square of Jing’an Temple Station of Metro Line 2, it is proposed that the engineering practice and mechanism of SMW pile On the preliminary summary and analysis, with a view to engineering and technical personnel to grasp the displacement of the pile, supporting the force and the trend to provide some basis.