静态投资控制与降低工程造价——五强溪水电站投资变化情况的测算及分析

来源 :水利水电工程造价 | 被引量 : 0次 | 上传用户:okzzh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
通过测算分析,五强溪水电站工程静态投资变化为零,应该说静态投资得到较好控制。但动态投资(枢纽部分)却增加了36.67%(不含汇率增加)。降低水电工程造价的出路在哪里?国家应在发展能源的政策与战略决策上,对水电站予以倾斜,要根据水电的突出特点和综合效益,把水电作一次能源对待,解决贷款利率、投资分摊、上网电价等诸多重大问题。 Through calculation and analysis, the change of static investment in Wuqiangxi Hydropower Station project is zero, and it should be said that the static investment is well controlled. However, the dynamic investment (hub part) increased by 36.67% (excluding exchange rate increase). Where is the way to reduce the cost of hydropower projects? The state should tilt the hydropower station in its policy and strategic decision-making on energy development. According to the salient features and comprehensive benefits of hydropower, the hydropower should be treated as primary energy and the loan interest rates should be solved. The investment apportionment, Internet price and many other major issues.
其他文献
世界上最大的斜张桥诺曼底桥工程即将动工兴建。该桥主跨跨径达856m(塔身为混凝土,主跨为钢箱梁,边跨为预应力混凝土箱梁),位于道维尔海峡勒阿弗尔港。混凝土结构的施工由两
我不是官,无意为官者辩。但是,我仍要固执地问:朋友,假设你也当了官,你能保证自己两袖清风吗? 抽鸦片是能上瘾的。官与鸦片一样,也能上瘾。只要当官可以享受许许多多草民们
目前,我国的水电建设面临的形势十分严峻,开工明显不足。其主要原因之一在于水电工程规模庞大,投资也庞大。近几年来,包括水电工程在内的基本建设投资增长较快,其原因是多方
本文介绍了真空微电子器件场发射阴极硅尖阵列的制备工艺技术。采用硅的各向异性腐蚀工艺和氧化削尖技术制成了形状和发射性能均较好的硅尖阵列,测试结果表明,起始发射电压为5~6V,发
在坚硬石料来源有困难的地方,采用水泥土基层,上铺单层沥青混凝土面层,作为3~5级公路的路面,在未来将被广泛采用。这不仅解决了筑路材料问题,并且能降低造价的20~60%。苏联从19
城市湿地公园的开发与建设有着重要的意义,但目前我国在城市湿地公园在开发中仍存在不少问题。该文以贵阳花溪十里河滩湿地公园为研究对象,分析其开发和利用中的问题所在,提
本文侧重分析电子束纳米光刻中的若干限制因素,包括电子光学系统中的象差、电子束与抗蚀剂的相互作用(散射与二次电子效应)、衬底条件等,并对已用于进行纳米分辨率电子束光刻中的
本文简要介绍为开发“两航两港船舶调度信息系统”急需的标准与约定所取得阶段性成果,研究的向题集中在编码、数据定义和通信文件格式方面。文中所述各类标准与约定都只具有
《当代中国》丛书公路卷——《当代中国的公路交通》,即将由中国社会科学出版社出版。该书由交通部负责组织编写,全书系统地记述了新中国公路交通自1949年至1987年所取得的巨
国家“七、五”期计划开工项目,福建省“七、五”重点工程——福州港7500吨级客运码头于1990年11月30日正式动工兴建。 新建设的7500吨级客运码头位于福州马尾新港区,码头全