论文部分内容阅读
报导了莱茵河桥 (D櫣sseldorf和Neuss之间 ) ,Erft运河桥和Hohenzollern桥的设计、建造和架设 ,这些桥梁是Hagen和Monchengladbach之间城市铁路和科隆城市铁路的扩建所必需的。在建造现场主要是采用手工焊和埋弧焊。对装配和架设中耳板的合理技术配置给予了特别注意。实践证明 ,本文实例中所采取的解决方法是有效的。
Reported the design, construction and erection of the Rhine Bridge (between Düsseldorf and Neuss), the Erft Canal Bridge and the Hohenzollern Bridge, which are necessary for the expansion of the urban railway between Hagen and Monchengladbach and the Cologne City Railway. In the construction site is mainly used manual welding and submerged arc welding. Special attention is paid to the rational technical configuration of the mounting and setting of the middle ear plate. Practice has proved that the solution adopted in the example in this paper is effective.