论文部分内容阅读
本文介绍了日本在预应力混凝土桥梁施工中应用电子计算机测量梁的挠度、支座反力和斜拉桥斜索张拉管理的情况。文中还列举了实例。
In this paper, the deflection of the beam, the reaction force of the support and the cable tension management of the cable-stayed bridge are introduced in the application of the computer in prestressed concrete bridge construction in Japan. The article also cited examples.