论文部分内容阅读
针对现有高温水首站蒸汽余热余压不能全部利用的不足,分析工业汽轮机发电技术在高温水换热首站中应用的可行性及运行情况。
In view of the insufficiency of the steam residual heat and residual pressure in the existing high temperature water first station, the feasibility and operation of the industrial steam turbine power generation technology in the first station of high temperature water heat transfer were analyzed.