响水涧抽水蓄能电站桥式起重机安装技术

来源 :施工技术 | 被引量 : 0次 | 上传用户:bitdefender2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
桥式起重机安装是抽水蓄能电站主厂房混凝土浇筑和机电安装的首要条件,桥式起重机大件吊装是桥式起重机安装过程中的难点。利用AutoCAD软件对响水涧抽水蓄能电站桥式起重机大件的现场摆放和吊装过程进行全程设计。结合地下厂房空间有限等安装难点,介绍了利用AutoCAD进行安装策划的方法及桥式起重机安装操作具体工艺措施。结果证明,安装质量优良。 The installation of overhead crane is the primary condition of concrete pouring and mechanical and electrical installation in the main plant of pumped storage power station. The large crane of overhead traveling crane is the difficulty in the installation of overhead traveling crane. The whole process of site setting and lifting process of overhead crane of Xiangshuijian Pumped Storage Power Station was designed by using AutoCAD software. Combined with the limited installation space such as the underground workshop space, this paper introduced the method of installation planning using AutoCAD and the specific technical measures for the installation and operation of overhead traveling crane. The results show that the installation of good quality.
其他文献
大型抽水蓄能电站地下厂房桥式起重机安装空间狭小,而配置的桥式起重机大梁为超大超重构件,在施工中吊装难度较大。以辽宁蒲石河抽水蓄能电站地下厂房桥式起重机施工为例,介
懸泉漢簡出土於敦煌甜水井東南3公里的漢代懸泉置遺址,該遺址位於今安西與敦煌兩縣交界處安敦公路南側一公里的戈壁灘上,是一處漢魏時期的郵驛機構。懸泉置漢簡的出土為漢代政