1997年底,欧共体(EC)的THERMIE计划挑选了187个小水电工程给予资助。此行动是欧共体促进技术革新和欧洲工业竞争的庞大计划的一部分。这些工程的总造价为4.55亿美元(3.963亿欧元),为此,THERMIE拨款5590万美元,占总造价的12.3%。虽然小水电工程很多,但平均装机容量仍为860kW。尽管THERMIE对所有小水电技术是有用的,但38%的小水电站的水头低于5m,且低水头桨式水轮机占总数的46%。其原因是,在大多数情况下,只有低水头电站至今尚未开发。
At the end of 1997, the European Community (EC) THERMIE program selected 187 small hydropower projects to be funded. This action is part of the EU’s vast plan to promote technological innovation and industrial competition in Europe. With a total cost of 455 million U.S. dollars (396.3 million euros), THERMIE allocated 55.9 million U.S. dollars, or 12.3% of the total cost. Although a lot of small hydropower projects, but the average installed capacity is still 860kW. Although THERMIE is useful for all SHP technologies, 38% of SHP’s have heads below 5 m and low-water propeller turbines account for 46% of the total. The reason for this is that in most cases only low head stations have not been developed yet.