论文部分内容阅读
红水河是我国水能资源的一个“富矿”,是华南地区的重要能源基地。该河流的综合利用规划,已于1981年10月间由国家能源委员会和国家计划委员会主持召开会议进行审查(见《水力发电》1981年第11期本刊讯)。会议同意红水河以发电为主,兼顾防洪、航运、灌溉、水产等综合利用效益的开发方针,基本同意规划报告提出的按十级开发的方案;初步安排了各梯级水电站的开发顺序。与会代表一致建议加快开发速度,以适应我国社会主义现代化建设的需要。
Hongshuihe is a “rich mine” of hydropower resources in China and an important energy base in southern China. The plan for the comprehensive utilization of the river was reviewed by the National Energy Commission and the State Planning Commission in October 1981 for the meeting (see “Hydropower”, No. 11, 1981). The meeting agreed that Hongshuihe should take the power generation as the main task, give consideration to the development guideline of flood control, shipping, irrigation and aquatic products, and basically agree with the development plan proposed by the planning report at the tenth level. The development sequence of each cascade hydropower station has been initially arranged. The delegates unanimously recommended speeding up the development so as to meet the needs of socialist modernization in our country.