论文部分内容阅读
近几年,在锅炉检验工作中曾多次发生因缺水而造成胀接管端泄漏,导致被迫停炉、停产。对於生产用炉,停炉后,将给生产单位带来很大损失。处理这种泄漏,我们采取了三种办法进行尝试,情况如下: 一、胀接管二端加衬筒我市某食品厂有一台KZL2—8锅炉,使用压力6kgf/cm~2,因缺水造成上部三根烟管严重泄漏,被迫停炉。时值中秋佳节来临,生产任务较重,而这台锅炉原曾因渗漏已复胀过
In recent years, there have been repeated leaks in the boiler inspection work due to lack of water, leading to the forced shutdown of the furnace and the shutdown of production. For the production of furnace, shutdown, will give the production unit a great loss. To deal with this leakage, we have taken three ways to try, the situation is as follows: First, the expansion of the two ends of the liner plus liner tube A food factory in our city has a KZL2-8 boiler, the use of pressure 6kgf / cm ~ 2, due to lack of water The upper three pipe serious leakage, forced to shut down. Time Mid-Autumn Festival approaching, heavier production tasks, and this boiler has been due to leakage of complex expansion