论文部分内容阅读
使用高液限土用于90区路基填筑,必须通过严格的施工工艺控制,切实把握压实度和饱和度双控检测指标;同时加强施工全过程的监督和监理,路基施工质量是能够达到《公路路基施工技术规范》要求。
The use of high liquid limit soil for 90 subgrade filling must be controlled through strict construction technology and effectively grasp the compaction and saturation double-control detection index; at the same time to strengthen supervision and supervision of the entire construction process, the quality of subgrade construction is able to achieve “Highway Subgrade Construction Technical Specifications” requirements.