论文部分内容阅读
2002年4月12日下午在新疆石油局油田开发协调部主持下,新疆局采油工艺研究院与于新疆局机械制造总公司进行了KY65/21-JYE型抽油井口技术交接,交接仪式在机械制造总公司举行,这次交接采研院向机械制造总公司移交了设计图纸54张,使用维护说明书4份。KY65/21-JYE型抽油井口是由采油工艺研究院开发
On the afternoon of April 12, 2002, under the auspices of the Oilfield Development and Coordination Department of Xinjiang Petroleum Bureau, the Xinjiang Oil Production Technology Research Institute and the Xinjiang Bureau of Machinery Manufacturing Company carried out the technology transfer of oil well KY65 / 21-JYE. The handover ceremony was held on the machinery Manufacturing Corporation held the transfer of the Institute of Technology to the Machinery Manufacturing Corporation handed over 54 design drawings, the use of maintenance instructions 4 copies. KY65 / 21-JYE pumping wellhead is developed by the Oil Production Technology Research Institute