用网络法编制高层建筑的施工进度计划,显然比横道图等传统方法好得多,而有经验的网络计划员则认为,网络法应用高层建筑施工,其效果总还不理想,比不上其他建筑物。这是由于没有识别高层建筑是一项混合性的工程,因此在高层中应用网络技术时就出现了一些问题。实际上典型的高层施工可以区分为二种不同程式:在第一个程式中,包括平整场地,基础工程和第一层标准层结构等基本准备项目,按这些项目顺序制成一个常用的、具有明确的起点和终点的施工计划。在这一情况中,基本可按网络法要求制订出进度计划,并对执行情况加以检查,能发挥很好的作用。然
The use of the network method to compile the construction schedule of high-rise buildings is obviously much better than the traditional methods such as the crossbar diagram. However, experienced network planners believe that the application of high-rise building construction by the Internet method is not always satisfactory and is not as good as other methods. building. This is because the failure to identify high-rise buildings is a mixed project. Therefore, there are some problems in the application of network technology in high-level buildings. In fact, typical high-rise construction can be divided into two different types of programs: in the first program, basic preparation items such as leveling sites, basic projects, and first-level standard layer structures are constructed. Clear start and finish construction plans. In this case, it is basically possible to formulate a schedule according to the requirements of the network law, and to check the implementation situation, which can play a very good role. Natural