Analysis Model on Penetration Depth of Concrete by Eroding Long-Rod Projectiles

来源 :北京理工大学学报(英文版) | 被引量 : 0次 | 上传用户:JINZI1975
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Mass loss should be considered while calculating the penetration depth of concrete by eroding long-rod projectiles of high velocity. The penetration process is divided into two phases: eroding phase and rigid phase. During eroding phase, a model to predict the penetration depth is established on the assumption that there is a chipping region in the bottom of crater. During rigid phase, Forrestal formula is adopted to calculate the penetration depth. Using this model, the depth of concrete penetration by a tungsten alloy long-rod projectile is calculated. When the critical eroding velocity is between 950 m/s and 1 000 m/s, the result is in good agreement with the experimental data.
其他文献
新疆是一个多民族聚居的地区。不同民族、不同语言长期接触和相互影响产生了语言兼用和语言转用现象,使新疆成为双语和多语共存区域。探讨和研究新疆少数民族地区双语和多语
21世纪是知识和信息资讯爆炸的E时代.传统的教师培训模式由于其固有的矛盾,已不能适应E时代的需要,基于网络的e-Learning培训模式具有与时俱进性、人本性、主体性、过程性等
目的掌握西昌试区沟渠钉螺的分布特点.方法用全球定位系统(GPS)和地理信息系统(GIS)绘制的沟渠地图指导查螺,采用系统抽样法查螺,框距10 m,压碎法检查钉螺血吸虫感染情况,并
介绍了一块Φ520mm大相对孔径(F/1.6)轻量化椭球面反射镜的加工与检测方法。镜面的有效口径为Φ502mm,顶点曲率半径为1600mm,非球面系数k=-0.9663,面形精度要求优于0.025λ(R
本文旨在讨论考试的科学属性,并结合高校英语专业四、八级考试大纲(2004年新版)的修订,探讨如何认识和提高考试的科学属性。
白蚁管涌(漏)与水利管涌是两个完全不同的概念,而水利工程技术人员往往将其混淆起来,统称为水利管涌进行处理.本文则以大量的事实真相论述它们的区别和不同的处理方法,结论是
DCMI维护着一个包含众多元数据术语的词表,其中最主要的是包括15个元素的都柏林核心。然而,DCMI 所关注和讨论的并不只是这个核心集,以及围绕这个核心集的实践、策略和模型,D
介绍动态 (电位 )法测定煤层压裂裂缝方位、长度等参数的测试技术 ,它是针对煤层的固有特点 ,在室内进行大量物理模型试验 ,结合现场试验后取得的科研成果。文中简要阐述动态
Pricing the American put options requires solving an optimal stopping problem and therefore is a challenge for the setting up of simulation parameters. This pap