放淤固堤施工加固黄河大堤始于70年代,最先是在险工堤段进行,是在河道嫩滩临河槽侧就近选择沙场,输沙距离较近。近年来随着险工段放淤固堤的逐步完成,放淤固堤施工逐渐向平工堤段延伸,寻找近距离沙场越采越困难,不得不远距离找沙场,输沙距离越来越远,造成施工成本不断增加,给放淤固堤施工带来
Dredging solidification embankment construction reinforcement The Yellow River embankment began in the 1970s, the first is in the embankment section of the river, is near the river channel near the river trench side of the selection of sand, sand transport distance closer. In recent years, with the gradual completion of the silt-curing embankment in the dangerous section, the construction of the silt-dumping solid embankment gradually extends to the section of the embankment section, and it is difficult to find the more-hardened it. Therefore, it has to find the saloon over a long distance, Costs continue to increase, to bring silt solidification embankment construction