水电站水库常规调度图是确定水库运行的基本依据,上、下基本调度线确定了保证出力的范围。当库水位处在上基本调度线时保证出力反映了历时法保守的一面,而当处在下基本调度线上时保证出力则反映历时法风险性的另一面。对常规调度图的某些调度线进行经验性改动,用形成的新调度图指导水库运行,并用多年入库径流资料进行计算,提高水库能量指标。建立相应的数学模型对常规调度图进行优化,在保证率不变的前提下,提高水库的运行效益。
The conventional hydropower station reservoir plan is to determine the basic basis for the operation of the reservoir, the basic dispatch line to determine the scope of guaranteed output. When the reservoir water level in the basic scheduling line to ensure that the power output reflects the conservative side of the calendar method, and when in the next basic scheduling line to ensure that the output is reflected on the other side of the risk of time-lapse method. Make some changes to some of the scheduled lines in the routine dispatch map, guide the operation of the reservoir with the new dispatching map formed, and calculate the reservoir energy index with the multi-year runoff data. The corresponding mathematical model is established to optimize the conventional dispatch map, and improve the operational efficiency of the reservoir under the premise of the same guarantee rate.