论文部分内容阅读
对某一实际工程的60 t钢锭翻锭装置进行计算分析,选择最佳连杆组合方案,并计算翻锭装置电机功率,可为相关设计提供参考借鉴。
The calculation and analysis of a 60 t ingot turning device of an actual project, selecting the best connecting rod combination plan and calculating the motor power of the turning device can provide reference for the related design.