论文部分内容阅读
根据对片区建筑物消防系统日常运行情况的调研,就消防联动控制系统和被控设备的连接问题进行了探讨。控制系统与被控设备的连接是否完好,在日常运行过程中,难以体现出来。错误的连接方式往往造成火灾时消防系统运转失效,造成不必要的损失。根据走访调研,并结合新修订的相关规范,指出了现场实际施工中存在的检线电阻连接问题、排烟阀接力控制问题、不同方式控制连接接口问题。
Based on the investigation of daily operation of building fire control system in the district, the connection between the fire control system and the controlled equipment was discussed. Control system and the accused equipment connection is intact, in the daily operation process, difficult to reflect. Wrong connections often result in failure of the fire protection system during a fire, resulting in unnecessary losses. According to the investigation and study, combined with the newly revised relevant norms, it points out the existence of the inspection wire resistance connection problem, exhaust valve relay control problem, the different ways to control the connection interface problems in the actual construction site.