论文部分内容阅读
风鼓洞水电站位于湖北省宜都县,是一座用4km渠道引用风鼓洞和犀牛洞的泉水发电的小型水电站,装有1台800kW的机组,其水轮机的主要参数如下:型号QJ-W-92/1×11;设计水头184m;流量0.567
Fengguangdong Hydropower Station is located in Yidu County, Hubei Province. It is a small hydropower station that uses 4km channels to generate spring water from Fenggong Cave and Rhinoceros Cave. It is equipped with one 800kW unit. The main parameters of the turbine are as follows: Model QJ-W- 92/1 × 11; design head 184m; flow 0.567