论文部分内容阅读
现场钢筋工程主要包括:钢筋的冷加工、钢筋焊接连接、钢筋机械连接和钢筋的配料与代换,就施工员如何在现场把控钢筋工程进度和质量,可从原材料、钢筋加工和钢筋安装三方面入手,今天就为您带来钢筋工程检查的工序和步骤。钢筋工程检查工序1.检查资料查看钢筋合格证、钢筋检验报告以及钢筋电渣压力焊接头检验报告,查看钢筋、模板的检验批验收记录、楼层放线记录。
On-site steel works include: cold-formed steel, welded steel connections, reinforced mechanical connections and reinforcement ingredients and substitutions, on the construction workers how to control the progress and quality of reinforced projects, from raw materials, steel processing and installation of steel reinforcement Start, today to bring you the steps and steps of steel engineering inspection. Reinforced Engineering Inspection Procedures 1. Check the information to view the reinforcement certificate, steel reinforcement inspection report and steel slag welding inspection report, check the inspection records of reinforcing steel and template inspection records, floor release records.