百色水利枢纽工程位于广西郁江上游的右江上,是开发治理郁江的关键性工程,坝址在百色上游22km处,主坝为全断面碾压混凝土重力坝,坝顶高程234m,最大坝高130m,坝项长700m,坝顶宽10m。百色水利枢纽工程砂石系统的生产能力为1500t/h,矿石原料为灰绿岩,在人工砂石料生产系统中,给料、破碎、筛分和制砂设备是最主要的砂石生产设备,设备配置主要依据混凝土生产所需的砂石质量和数量、砂石生产工艺流程以及设备生产能力等因素综合考虑,设备的安装与调整是设备正常运行、发挥最大效率的综合保障。经过几年的生产运行,可以认为该系统的设备配置及安装整体上是成功的,基本达到了技术先进、运行可靠和经济合理的标准。
The Baise Project is located on the Youjiang River in the upper reaches of Yujiang River in Guangxi Province. It is a key project for the development and control of the Yujiang River. The dam site is 22km upstream from Baise. The main dam is a full-face RCC gravity dam with crest elevation of 234m and maximum dam height of 130m. Dam length 700m, crest width 10m. The production capacity of the Baise water system project sandstone system is 1500t / h, and the ore raw material is gray-green rock. In the artificial aggregate production system, feeding, crushing, screening and sand making equipment are the most important sandstone production equipment, Equipment configuration is mainly based on factors such as the quality and quantity of gravel needed for concrete production, gravel production process and equipment production capacity and other factors considered, the installation and adjustment of equipment is the normal operation of equipment, to maximize the efficiency of comprehensive protection. After several years of production and operation, it can be considered that the equipment configuration and installation of the system as a whole has been successful and has basically reached the standard of advanced technology, reliable operation and economic rationality.