论文部分内容阅读
古里水电站位于委内端拉奥里诺科河的支流——卡罗尼河上。该电站一期工程于1963年动工,1977年完工。安装10台发电机组,总容量为266万千瓦。二期扩建工程1978年开工,1986年底竣工。原有大坝加高到162米,坝顶全长增加到1426米,水库正常蓄水位提高到270米,总库容增加到1380亿立方米。1号厂房10台机组的装机容量增至300万千瓦,加上2号厂房10台机组730万千瓦,总装机容量为1030万千瓦,年发电量达到510亿千瓦时。
Guli hydropower station is located in the Tributary of Orinoco River Tributary - Caroni River. The first phase of the power station started construction in 1963 and completed in 1977. Installed 10 generating units, a total capacity of 2.66 million kilowatts. Phase II expansion project started in 1978, completed by the end of 1986. The original dam was raised to 162 meters, the total length of the crest increased to 1426 meters, the reservoir normal water level increased to 270 meters, the total storage capacity increased to 138 billion cubic meters. The installed capacity of 10 units of plant No. 1 increased to 3 million kilowatts, plus 7.3 million kilowatts of 10 units of plant No. 2 with a total installed capacity of 10.3 million kilowatts and an annual generating capacity of 51 billion kilowatt hours.