论文部分内容阅读
旱、洪灾害的交替出现和交织出现是川中地区工农业生产和人民生活的严重威胁。以往局限于盆地内的各种治理措施和西水东调方案所存在的最大问题,便是对区域工程地质特征还认识不足。因而收效甚微或难以实施。本文通过对水资源分布与工程地质条件的初步研究认为,在盆地北部边缘山区以修建大
The alternation and interweaving of drought and flood disasters are serious threats to the industrial and agricultural production and people’s livelihood in central Sichuan. In the past, the most serious problem that existed in the various control measures within the basin and the program of west-east water transfer was the lack of understanding of the regional engineering geological features. Thus ineffective or difficult to implement. This paper through the preliminary study of water resources distribution and engineering geological conditions that the northern edge of the basin to build large