已建工程项目补报水土保持方案中应注意的问题

来源 :河南水利 | 被引量 : 0次 | 上传用户:zhi911
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 补报水土保持方案的工程项目范围需补报水土保持方案的工程项目包括已批复还未实施的工程项目和已建工程项目两类。已建工程项目是指已经建成正在运行,受项目特点影响,仍造成较严重水土流失的工程项目,实际中多为采矿类项目,由于运行时间长,产生的废渣、废石等废弃物较多,而项目建设时《水土保持法》尚未颁布实施, 1 Replenishment project scope of soil and water conservation projects Replenishment project of soil and water conservation projects include approved projects have not yet been implemented and the two projects have been built. The project has been built already under construction has been running, affected by the project characteristics, still cause serious soil erosion of the project, in fact, mostly mining projects, due to long running time, resulting in more waste, waste rock and other waste , While the project of “Soil and Water Conservation Law” has not yet promulgated and implemented,