论文部分内容阅读
一、井场标准化塔河修井队伍多为XJ-650以上大型修井机,一旦发生井喷事故,经济损失必然十分惨重。作为井控工作的一项内容,井场标准化是塔河工区必须首先做好的工作之一。井口与各种设备之间,各种设施相互之间必须符合标准的安全距离;污油罐摆放在施工
First, the standardization of wellhead Tahe Workover team mostly XJ-650 above large workover rig, in the event of a blowout, the economic losses will inevitably be very heavy. As part of well control work, wellsite standardization is one of the first tasks that the Tahe work area must do well. Wellhead and a variety of equipment, various facilities must meet the standard safety distance between each other; sewage tank placed in the construction