为做好新疆抽水蓄能电站的规划建设,规范项目前期工作,确保抽水蓄能电站有序开发和电网安全经济稳定运行,2012年2月16日,国家能源局以“国能新能[2012]49号”复函新疆自治区发展改革委和水电水利规划设计总院,同意新疆抽水蓄能电站选点规划成果及审查意见,确定阜康(拟装机120万kW)、哈密天山(120万kW)站点为新疆电网2020年新建抽水蓄能电站推荐站点,阿克陶 In order to do the planning and construction of Xinjiang Pumped Storage Power Station and standardize the preliminary work of the project to ensure the orderly development of pumped storage power station and the safe and economic operation of power grid, on February 16, 2012, the National Energy Administration took “ 2012] No. 49 ”Reply Xinjiang Development and Reform Commission and Hydropower Planning and Design Institute, agreed with the Xinjiang Pumped Storage Power Station planning and review of the findings, to determine Fukang (to be installed 1.2 million kW), Hami Tianshan (120 000 kW) site for the Xinjiang Power Grid 2020 new pumped storage station recommended site, A Ketao
其他文献
大朝山水电站于1992年7月开始筹建.电站首台机组已于2001年12月14日提前投产发电,标志着电站建设一个重要里程碑的形成和建立。大朝山水电站建设管理的成功经验,贯穿于公司现
水电工程施工项目周期较长,施工条件复杂,施工中不确定因素多,不可避免具备诸多变更与索赔的可能。对变更与索赔的区别、申报的特点、申报的依据、申报的难点及规避对策进行
水库的现代化建设是提高水库管理水平的要求和目标,结合惠州市白盆珠水库近年来在自动化建设方面所做的工作,扼要介绍在设计与施工中的一些措施。 The modernization of the
“四人帮”粉碎三年以后,迎来了二十世纪八十年代第一个春天。由于主客观错综复杂的原因,从事舞台艺术的人,并不因为春暖花开而心旷神怡,因为缺少理想的剧目可排,排出新戏上
目的比较综合治疗前后手臂振动病患者神经电生理变化情况,观察其治疗效果。方法对初次诊断及经过3个月综合治疗的32例轻度手臂振动病患者,进行神经电生理检查结果对比分析。
1 调差制度是市场经济的必然产物水利水电建设是国民经济的重要组成部分,随着社会主义市场经济体系的建立,商品的价格将受经济规律作用,具有市场性、动态性。商品价格以价值
“人是要有一点精神的。”作为社会主义时代的戏剧工作者,灵魂的工程师,是应该特别提倡社会主义精神文明的。最近,在全国各地,人民群众热烈地开展以“五讲”(讲文明、讲礼貌
近几年来,随着素质教育的发展和教育信息化在教学中的推广,英语教学理念从以教师为中心转向以学生为中心,教学手段从以教师讲授为主转为以学生练习为主。因此,传统的英语教学
在Mg注入形成的p型GaAs材料上,用预热和快速两步退火方式形成p型欧姆接触,用传输线方法(TLM)测量比接触电阻,得到最佳值3.73×10-5Ω·cm2,用在AlGaAs/GaAsHBT器件上,性能良好。 On the p-type GaAs material formed by
目的:研究凋亡相关因子Caspase-3和Bcl-2在甲基苯丙胺神经毒性机制中所发挥的作用。方法:40只健康雄性SD大鼠随机分为对照组(n=10)和实验组(又分为3个亚组,分别为注射1天后、