论文部分内容阅读
目前,对疏浚工程量计算内容作出明确规定的有两个文件,一是《水利水电工程设计工程量计算规定》(试行)(以下简称《规定》),二是《疏浚工程施工技术规范》(SL17—90)(以下简称《规范》)。分析、比较《规定》和《规范》所确立的计算内容,其相互之间并不完全统一,还存在矛盾和不尽合理之处。本文拟对疏浚工程量的具体计算内容进行研讨。
At present, there are two documents that clearly stipulate the calculation content of dredging volume. The first is “Provisions for Calculation of Engineering Quantity of Water Conservancy and Hydropower Projects” (for Trial Implementation) (hereinafter referred to as “Provisions”), and the second is “Technical Specifications for Construction of Dredging Engineering” SL17-90) (hereinafter referred to as “Specification”). Analyzing and comparing the calculated contents established by the “Regulations” and the “Regulations” is not completely unified with each other, and there are still contradictions and unreasonable points. This article intends to dredge the amount of specific content of the project to discuss.