长沙南站进站大厅和高架层候车大厅吊顶面积大、高度高、工期紧张、施工难度大。通过方案比选,确定采用高大空间吊顶单元式安装技术方案,整个施工过程不需搭设脚手架,提升设备轻便,可多点大面积施作,效率高,同时不影响地面工程施工。结果证明,该技术方案能有效降低成本,保证工程质量,缩短工期。
Changsha South Station into the lobby and elevated lobby waiting hall ceiling area of ?? large, high, tight construction period, construction of large. Through the program comparison and selection, to determine the use of high-ceiling unit installation technology solutions, the entire construction process without erecting scaffolding to enhance the equipment lightweight, can be more large-scale implementation, high efficiency, without affecting the ground construction. The results show that the technical solutions can effectively reduce costs, ensure project quality and shorten the construction period.