山西省中部引黄工程总干4号输水隧洞沿线高低起伏,穿越山川河流,地质情况非常复杂,为确保4号隧洞安全施工顺利运行,根据相应的设计规范及以往的工程实例,选取最不利的监测断面,布设相应的监测仪器。通过自动化采集系统,实时监控断面的各种应力变形,分析数据成果及时发现问题,验证设计成果。
In order to ensure the smooth operation of No.4 tunnel safety construction, according to the corresponding design specifications and the previous engineering examples, the most unfavorable geological conditions are selected for the water diversion tunnel along the No.4 trunk channel of the Yellow River Diversion Project in Shanxi Province. Monitoring section, layout of the corresponding monitoring equipment. Through the automated acquisition system, real-time monitoring of the various sections of the stress and deformation, analysis of data findings and timely detection of problems, to verify the design results.