论文部分内容阅读
本文介绍了映秀湾水电站采用高水位运行,定期冲淤的方法,顺利地解决了泥砂、漂木过闸问题的经验。文中还作了技术比较。
This article introduces Yingxiuwan hydropower station using high water level operation, regular scouring and silting method, successfully solved the silt, drift wood gate problem experience. The article also made a technical comparison.