论文部分内容阅读
强家湾水库,是在一九五五年农业合作化运动高潮中建起来的。十多年来,我们从实践,认识,再实践,再认识的过程中,逐步掌握了水库管理运用的规律,把配、管、用紧密结合起来,使这座水库工程越管越好,水量越管越多,效益越管越大,产量越管越高。建库初期,坝高十六米,蓄水量二百一十万立米,设计灌溉面积一万四千亩。后来,土坝加高到二十六米,蓄水量增加到七百六十五万立米,灌溉面积扩大到三万二千亩。灌区粮食亩产由建库前的三、四百斤,提高到六、七百斤;无产阶级文化大革命以来,有了更大的发
The Qiangjiawan Reservoir was built during the climax of the agricultural cooperative movement in 1955. Over the past decade or so, we have gradually mastered the law of reservoir management from practice, understanding, re-practice and re-cognition. We have closely integrated the allocation, management and use of pipelines to make the reservoir project more manageable and the volume of water The more tubes, the more effective the tube, the higher the yield of the tube. In the early period of the reservoir construction, the dam height was 16 meters and the water storage capacity was 2.1 million cubic meters. The designed irrigation area was 14,000 mu. Later, the earth dam was raised to 26 meters, its water storage capacity increased to 7,650,000 meters and its irrigated area expanded to 32,000 acres. The grain output per mu in the irrigated area has increased from three or four hundred jin before the construction of the reservoir to six or seven jin. Since the Great Proletarian Cultural Revolution,