论文部分内容阅读
西德两台配60万瓩机组的燃褐煤直流锅炉,将安装在尼特劳逊(Niederauβem)电站。这两台锅炉是由西德有关锅炉制造厂共同设计和制造的,主要是由西德奥格斯堡、纽伦堡机器制造厂(MAN)负责。按计划将于1973年下半年投入运行。锅炉主要参数如下:
Two West Germany-fired, lignite-fired boiler with 600,000 units will be installed at the Niederau beta power plant. The two boilers are jointly designed and manufactured by the West German boiler manufacturing plant and are mainly managed by the Augsburg-Nuremberg machine manufacturing plant (MAN). According to the plan will be put into operation in the second half of 1973. The main parameters of the boiler are as follows: